Viability Report and Conditions Survey

(Please scroll down for the Conditions Survey)

Viability as shown in the Feasibility Report:

Here is the report of the findings of our consultants who looked at the viability of our plans and made detailed assessments and suggestions.

This is the Conditions Survey, produced in the summer of 2024:

This is our call in November 2024 for a Section 48 Repairs Notice:

One thought on “Viability Report and Conditions Survey

  1. It certainly sounds positive enough. Let,s just hope it comes to fruition. Please keep me informed.. I hav’nt been inside the Hulme Hip since my Mum and Dad took me too the pantomines in the mid fifties but remember it as a stupendous building. The B.B.C. Playhouse was popular and ran good few years longer.